Welcome back to our $20k Homestead series! Links to all previous posts are at the end. This post is all about THE GRID.
The Grid
The (power) Grid
Our local power company is a membership co-op, but to be honest, I don't really know what that means other than they're a small regional company and do several community involvement projects.
Oh yeah, and saying the word co-op gives you warm fuzzies. Try it!
I called and setup a time for a representative to come out to our land and talk about connecting our home to the power grid. There were two options:
- 🐦 Aerial - Run wires from the nearest power pole to another sub-pole at our home and into our meter base.
- 🐛 Underground - Trench from the nearest power pole to where the meter base will be at our home, then have the lines laid in conduit.
We went with the Underground option. While more work, it's just a cleaner install and less hassle to work around in the long term.
The Expensive Way or The Fun Way?
We were responsible for digging the trench ourselves, and the power company had strict requirements:
- 📗 Minimum 36 inch depth the entire distance. Anything less than 36 inches would result in conduit not being run and a fee to come back out later.
- 📗 Minimum 6 inch width. Same as above... anything less and a re-visit fee would be charged.
- 📗 Be complete from point-to-point (no digging would be done by the power crew). The power pole and the house's meter base had to be exposed down to the 36 inch depth and ready for conduit to be attached and run up the poles.
- 📗 Our meter base be installed and ready for conduit to be attached.
Our septic installer was still on-site when we found out about trenching the power lines, so I asked him what his charge would be for digging the trench and leaving the back-fill to me... $300. The cost to rent a mini excavator from our local hardware store was $175.
❓ Now, which do you think we chose? It's okay, I'll give you a millisecond to think... Of course--the DIY/Cheap Way! A call to our local hardware store (who also rents equipment) and a the next day I had myself a mini-excavator! Waahoo!
What is a Meter Base?
Isn't that usually on the home?
You're too clever! Yes, it usually is... with "house houses"... or double-wide mobile homes. Single-wide mobile homes are viewed differently in our region and not considered permanent. We had the option of permanently mounting it to our home since we owned both the home and land, but knowing later down the road we would be redoing the exterior of the home and possibly adding on to it, I opted for the mount that was most likely to not require me calling the power company to come back out.
Trenching Time!
The next day after calling the hardware store, they delivered the mini excavator. It was Friday and I had it for the weekend at the cost of a 1 day rental. Perks of a mom-and-pop store being closed on Sunday and only open half day Saturdays.
While I Have It...
While I had the excavator, I did some cleanup work to the grading of the house site.
I also let Josh (my brother) use the excavator for some projects over at his place. We're all on the same tract of land. I think I mentioned that in another post. Anywho, he used it to begin his underground greenhouse, but I'll leave that for him... he's getting setup on Steemit and I'll let him share that awesome project.
Missing Photos
Either we forgot to take them, or we have misplaced them. Either way, we have no photos of us back-filling the trench with our fancy 2 inch conduit full of power in it. Oh well...
So you had power now?
Not yet... the power company doesn't connect the power to the home (by installing the power meter) until the county issues the Certificate of Occupancy... the official OK to live in the home. We're still a few projects away from that point...
Coming Up Next
This update puts us past a MAJOR milestone!!!
💸 💸 The End of Contractors! 💸 💸
Meaning, the rest of the work needed to get our CO from the county could be done by us! Waahoo! Now we were just waiting on... us!
Time to get going! We were only waiting on ourselves now!
See you on the next post!
Until then,
@greenacrehome
Do you like DIY?
Outdoor Kitchen Build Series - IN PROGRESS
Part 1, Part 2, Part 3, Part 4, and Part 5
$20k Homestead Series Past Posts
Part 1, Part 2, Part 3, Part 4, Part 5, Part 6, and Part 7.
The Grid is a part of the Tron system, created by Kevin Flynn... wait... wrong grid... Read about that grid here: http://tron.wikia.com/wiki/Grid
Peace, Abundance, and Liberty Network (PALnet) Discord Channel. It's a completely public and open space to all members of the Steemit community who voluntarily choose to be there.Congratulations! This post has been upvoted from the communal account, @minnowsupport, by greenacrehome from the Minnow Support Project. It's a witness project run by aggroed, ausbitbank, teamsteem, theprophet0, and someguy123. The goal is to help Steemit grow by supporting Minnows and creating a social network. Please find us in the
If you like what we're doing please upvote this comment so we can continue to build the community account that's supporting all members.
Another step closer to being finished! And I expected you did the DIY ;-) Resteemit for folks to start following you!
You know it. :) If it can be DIY'd, I will do it. If I don't know how, I will research and learn until I know how. :) Thank you so much for the resteems! I appreciate it, really.
Being connected to the grid isn't necessarily bad. But, it helps to have a plan for not being connected when you setup the connection in the first place.
True 'dat! :-) To my surprise, our power company has a free program where you can have someone come out and evaluate and talk about grid-tie systems and such for your home. Our neighbor has a grid-tie system with about 30 PV panels (old though, probably 8+ years). He "makes" about $75 a month from them.
I wouldn't really be interested in a grid-tie system. I'd rather wire up separate solar circuits in the home and slowly switch over, or (more realistically) run a hybrid system with both power options.
Well, if you have a battery system that runs the entire house, it can be charged either from the grid or the alternate energy methods. Obviously, getting started with one of those systems is a little pricey, but in the long run, you have the added security of being able to charge your house battery when the grid goes down. And, you don't have to add the alternate energy methods immediately.
Well written!
Now that I have this in my comments I will wait to resteem.
I like the underground option too. Does this give you power outside at the base? or do you need a generator for electric tools?
Still no power at all. They're good at setting it up to where you can't bypass it. Not that I would have even tried... KAAAZZZZAP!!!
Woo looking great!! We thought about renting a mini excavator for a variety of projects, but we would have to go through Home Despot, and they don't deliver and cost arms and legs, ugh.
One thing I want to mention, have you priced out home-owner's insurance yet? We moved from a regular house to a manufactured home and found out the hard way that most home owner's insurance companies will not insure this type of home & we had to get specialty insurance. We're now paying more for insurance on our $30k house than we did for our $200k house, and for a fraction of the coverage. It's ridiculous! Just wanted to mention because this is something I wasn't expecting and it had an impact on our budget!
We rented the backhoe from Home Depot for the soil test pits, and you're right! They're very expensive!!!
We're still researching insurance options. It's not been easy, but unfortunately, also not been top on our list. I'll get my wife to check into it. She's good at pinning things like that down. :)
This post has received a 3.72 % upvote from @booster thanks to: @greenacrehome.
click here!This post received a 1.8% upvote from @randowhale thanks to @greenacrehome! For more information,