The task was to decommission the 11000 volt Sub Station, the access on foot was fine although the position needed a 200 tonne crane to span the housing so to remove safely... a simple 5 tonne lift... planning is the essence.
Access to the Sub Station
Removal of telecommunications first
Setting up the Crane
In position for the lift
Limiting in progress
Nearly there
Touchdown